A-LIFE Mission Calender

09.03.2017
 

Integration of 2µ lidar and mech. approval

09.03.2017:

Integration of 2µ lidar into Falcon (cont.) and mechanical approval

08.03.2017
 

Integration of 2µ lidar

08.03.2017:

Integration of 2µ lidar into Falcon and further tubing

07.03.2017
 

Integration of CCNC and A-HEAD rack

07.03.2017:

Integration of CCNC and A-HEAD rack into the Falcon and tubing

06.03.2017
 

Instrument upload at DLR

06.-13.03.2017:

Instrument upload in Falcon aircraft at DLR